The initial processing at Cochrane Hill would result in tailings ponds on site, contained behind dams perched above the St. Mary’s watershed. Any treated effluent would be discharged into the Cameron Lakes, which drain through McKeens Brook, arguably the most productive spawning habitat on the river, according to Beaver.
Modern open-pit gold mines operate differently, aiming to extract only small flakes of gold diffused throughout tonnes of rock. Rock is excavated, crushed and treated to leach out gold. The remnants are then deposited in a waste pile and resulting chemical muds are stored in tailings ponds, which remain long after the life of a mine.